[. . . ] The optional skirt is designed to allow the minimum service access necessary to the motor/pump and plumbing of the bath. [. . . ] Allow clearance of at least 8" in front of bath for skirt removal. The skirt should be attached after the bath has been installed. 90° 90° Check that wall structure is plumb and square to the floor. Shim the framing if necessary before finishing to ensure a square opening. Install the bath per instructions supplied with the individual product. Bath Skirt Installation The bath should already be set and levelled. Electricity should be connected and bath system tested to be sure it is working properly before installing the skirt. Locate the front surface of the bottom rail 5/8" behind the front surface of the vertical posts as shown in illustration 3. Fasten the bottom rail to the floor using the screws provided. 4 CENTER OF RAIL Lift the top of the skirt up under the rim of the bath, center the skirt in the opening, then swing bottom of skirt toward the rail and lower skirt onto rail. The Velcro® on the skirt and the bottom rail should mesh. FIXED SIDE PANEL FIXED SIDE PANEL SCREWS (PROVIDED) BOTTOM RAIL 5/8" BOTTOM RAIL WOODEN BLOCK SHELL CLIP LIFT TOP OF SKIRT UP UNDERNEATH RIM OF BATH INTERLOCKING VELCRO® TAPES 3 With isopropyl alcohol, clean an area 2" long (6 places) on the rail and bottom edge of the skirt. These locations should be at the center line and 12" from each end of both parts; (see illustration 4. ) Remove liner from adhesive backing and apply the strips of Velcro® hook tape to the bottom rail, 12" from each end and in the center, as illustrated. [. . . ] These locations should be at the center line and 12" from each end of both parts; (see illustration 4. ) Remove liner from adhesive backing and apply the strips of Velcro® hook tape to the bottom rail, 12" from each end and in the center, as illustrated. [. . . ]